Walkerston Bypass
Location
Mackay, QLD
Client
Fulton Hogan
Sectors
Stormwater drainage
Project Details:
The new Walkerston Bypass is the designated heavy vehicle route for B-double and other multi-combination vehicles, including A-double road trains, between the Bruce Highway and the Peak Downs Highway.
Key features include:
A new bridge with improved flood immunity over Bakers Creek
3 new road overpasses above the local cane railway network
Re-directs heavy vehicles away from local schools, retail and medical facilities in Walkerston
Removes heavy vehicle and local traffic interactions through Walkerston
Direct route for heavy vehicles required by Bowen Basin coal producers
Extends the life of a 74-year-old bridge, adjacent to a school yard
Reduces congestion through Walkerston.
Integrates with existing works on the Peak Downs Highway–Eton Range Upgrade and Mackay Ring Road (Stage 1)
McFadyen's Scope:
Installation of 29 cross drainage lines, ranging from 2 to 16 cell box culverts and 600mm to 1,500mm diameter pipework
Labour hire support to assist with delivery across multiple work fronts.
Works were delivered in a regional environment exposed to extreme heat, humidity and a prolonged high rainfall period. Despite the challenging conditions, McFadyen maintained steady production and supported broader site delivery through experienced labour and reliable plant support.
- Associated concrete structures
- Stormwater drainage
Related projects
Build your career on solid ground